Malin Abram successfully delivers the TRANSPORTATION OF KARISH NORTH PROJECT CARGO FOR TECHNIPFMC

Malin Abram were contracted by TechnipFMC to conduct the transportation engineering for various items of cargo in support of the Karish North development. This involved design of seafastenings, generation of stowage and securing plans, and detailed lift engineering using the vessel cranes aboard BBC Brisbane.


The cargo was loaded at Aviles, Spain and discharged in Limassol, Cyprus. The cargo consisted of a subsea Manifold, well jumper termination heads and suction pile.